
1. Accurate scoping: Thoroughly assessing hull, outfitting, and piping damage before work begins prevents cost surprises later.
2. Material compatibility: Staying true to original material specs when replacing chrome, copper, aluminum, or steel parts preserves corrosion resistance.

3. Floating dock scheduling: Docking and undocking timelines need to be synchronized with port traffic and weather conditions.
4. Site safety: Repair yards where cutting, welding, and painting happen simultaneously require strict safety protocols.
5. Documentation: Recording every repair step makes future class surveys significantly easier.
Have a project in this area? Tell us about it.
Where We Work
